HISTORICAL BACKGROUND
The Killearn Acres Middle Basin Drainage Improvements project is one of the
Transportation and Stormwater Capital Improvements Projects identified and
approved by the Board in late January 2009 after Tropical Storm Fay.
During Tropical Storm Fay homes on the west side of Forward Pass Trail between
Whirlaway Trail and Pimlico Drive experienced yard and structural flooding. The
main cause of the flooding was the inadequate channel conveyance system that
moves stormwater runoff along Forward Pass Trail to Lake Kanturk.
The Killearn Acres Middle Basin Drainage Improvements will hydraulically connect
the Killearn Acres Upper and Lower Basin drainage improvements constructed by
the County in 2009.
PROPOSED IMPROVEMENTS
The proposed improvements consist of installing a 38-inch by 60-inch
elliptical reinforced concrete pipe and improving the channel by re-grading and
lining the bottom with reinforced concrete ditch pavement.
The stormwater that currently comes down the channel behind the homes on the
west side of Forward Pass Trail will be directed underground to a new pipe
system that will convey the water under Forward Pass Trail and into the improved
concrete channel. The channel will direct the water south to Lake Kanturk.
Overall, this project will improve the stormwater conveyance system along
Forward Pass Trail and reduce flood stages for residences.
PROJECT EVENTS
Open House-Project Design Update
Date: February 10, 2011
Time: 6:00 PM-7:30 PM
Place: W.J. Montford III Middle School, Media Center
5798 Pimlico Drive,
Tallahassee, Florida 32309
PROJECT CONTACT
Felton Ard, P.E.
Leon County Department of Public Works
2280 Miccosukee Road, Tallahassee, Florida 32308
Email: Ardf@leoncountyfl.gov
Phone: (850)606-1515 Fax: (850)606-1501
|